Heliotech

SREIM-2

Location :

Waterloo

Panels installed :

184

Peak power :

79.12 kWp

CO₂ avoided :

25 tonnes each year

SREIM

This project involved installing 184 photovoltaic panels on the roof of the office buildings.

The installation was not so straightforward and presented a number of technical challenges:

  • Adverse weather conditions: Difficult climatic conditions complicated the progress of the work.
  • Fragile roof: The presence of flat tiles on a sensitive roof meant that special precautions had to be taken to avoid any damage.
  • Complex logistics: Managing logistics on site required careful coordination to ensure the smooth running of the installation.

This project illustrates the company’s commitment to the energy transition, providing a renewable energy source while reducing the building’s carbon footprint. Despite the technical challenges, the installation was successfully completed.